On Behalf of FRP Advisory Trading Ltd, Administrators of Silva Timber
Featured items
Weinig Powermat 1500 Planer Moulder (2019)
Weinig Rondamat 960 Profile Grinder, IPC 3020 Template Maker and Opticontrol Digital Tool Measuring (2019)
Houfek Twingo 300 Twin Head Timber Busher
Weinig Unimat Gold Moulder (2003)
Ceetec Timber Coating Equipment
3: Combilift 4 tonne LPG Multi-Directional loaders (2004 to 2012)
Nissan Counterbalance Forklift truck
Converted 40’ Shipping Container Canteen
Heavy Duty Cantilever Steel Racks
General Works Equipment: Shelving, Hand Tools, Work Benches, Dry Racks
Various Commercial Vehicles and Motor Cars
Subject to availability
Removal Deadline: Wednesday 24 January 2024, 4:00pm GMT
Removal Hours: Wednesday 3 January – Wednesday 24 January 2024, 9:30am to 4:00pm GMT
Collection is only permitted once a paid in full invoice has been received
The Buyer and or their removal contractor must supply their own lifting equipment Method statements and risk assessments, copies of all relevant insurances documents and operator licenses must be supplied and approved ahead of any item being dismantled or moved in accordance with Health & Safety policies. Site attendance for the duration of the removal process to be confirmed and agreed in advance
Anyone attending site will be required to wear the relevant PPE workwear including Hi-Viz Vest/Jacket and Safety Footwear.
Buyer`s Premium of 18% will be applicable to this sale
VAT at 20% will be added to the total price and Buyer’s Premium. Purchasers from overseas should note that the VAT on the Buyer’s Premium is not recoverable
All payments must be cleared in our account by Tuesday 19 December 2023, 4:00pm GMT
All Lots must be collected by Wednesday 24 January 2024, 4:00pm GMT, strictly by prior appointment
All persons arriving on site must report to the entrance and complete the signing in procedure book
This site is a full PPE area and everyone must comply whilst the site is designated as such. PPE worn must comply with all relevant Method Statements. Anyone not found wearing his/her PPE will be required to leave the site, if in doubt assistance must be sought from the site Supervisor
Manchester
M2 4WQ
UK