Quality brewery equipment, including Collinson Malt Silos (2019), Alan Ruddock Mill (2015), and a full suite of TM Inox brewing vessels (2014) – hot and cold water tanks, mash tun, copper vessel, and multiple fermentation vessels.
Items include -
Brewery
- 2 x Collinson SID082C Malt Silos (2019)
- Alan Ruddock AR 2000 Mill, Elevator, Hopper (2015)
- TM Inox Hot Water Tank 10.6m3 (2014)
- TM Inox Cold Water Tank 10.6m3 (2014)
- TM Inox Mash Tun 6.5m3 (2014)
- TM Inox Copper Vessell Jacketed 10m3 (2014)
- 2 x TM Inox Fermentation Vessels 9.2m3 (2014)
- 2 x TM Inox Fermentation Vessels 11.2m3 (2014)
- Moeschle Behalterbau Fermentation Vessel
- APV–Barnette & Rolfe Fermentation Vessel (1985)
Brewology Cask Filler
- Cask Force 400 E3 Cask Washer (2021)
- Brewology TH5 and TC62 Cask Washers (2015)
- Ancillary Assets
- Fulton 40J Steam Boiler, 400 Kw (2014)
- UK Exchangers UKE 4-9 Heat Exchanger (2014)
- ICS Cool Energy IC408 Chiller Unit (2014)
- 2 x Beermaster 3 Fan Chiller Units
- 2 x Beermaster 2 Fan Chiller Units
- Nifty 32 Scissor Lift
- Electronic Scales / Refrigerators / Effluent Treatment / Pressure Washers / Tap Room Furniture / Racking
Removal
Removal Deadline: Friday 8 August 2025
Removal Hours: Monday 4 August – Friday 8 August, 9:00am – 4:00pm BST, Strictly by Appointment
Collection is only permitted once a paid in full invoice has been received
The Buyer and or their removal contractor must supply their own lifting equipment Method statements and risk assessments, copies of all relevant insurances documents and operator licenses must be supplied and approved ahead of any item being dismantled or moved in accordance with Health & Safety policies. Site attendance for the duration of the removal process to be confirmed and agreed in advance
Anyone attending site will be required to wear the relevant PPE workwear including Hi-Viz Vest/Jacket and Safety Footwear
Terms & Conditions
Buyer’s Premium of 18% will be applicable to this sale
VAT at 20% will be added to the total price and Buyer’s Premium. Purchasers from overseas should note that the VAT on the Buyer’s Premium is not recoverable.
All payments must be cleared in our account by the date stated on the invoice
All persons arriving on site must report to the entrance and complete the signing in procedure book
This site is a full PPE area and everyone must comply whilst the site is designated as such. PPE worn must comply with all relevant Method Statements. Anyone not found wearing his/her PPE will be required to leave the site, if in doubt assistance must be sought from the site Supervisor
London
EC2V 8EY
UK
