Featured Items:
- 39 Various Injection Moulding Machines from 40T to 850T Including: Fanuc (2020/21), Engel (2010 to 2020), Bole (2022), Arburg (2013), Negri Bossi (1997 to 2016)
- Motan Central Feed & Drying Systems (2015/16 & 2019)
- Mold Master (2021)/Tool Temp/Wittman/Regloplas Temperature Controllers
- Piovan/VIsmec/Jenco/Moretto/Plastic Sysyems Hopper Loaders, Hoppers, Dryers
- Rapid/Moretto/Wanner Granulators
- Gardner (2021)/Compair (2019) /Mattie (2016) Air Compressors & Dryers
- Engineering Equipment Including: Hurco CNC Vertical Milling Machine, Hurco/Charmilles Spark Eroders, Bridgeport/Semco Milling Machines, Telsonic/Dawe Ultrasonic Welders, Baileigh/Nutool/Draper Pedestal Drills, Jones & Shipman/Jakobsen Surface Grinders, Colchester/Weller Lathes, Startrite/Unbranded Bandsaws
- Renishaw/Ferranti Systems/Mecmesin/Mitutoyo/Starrett Measurement Equipment
- Connect 2 Cleanrooms Mobile Clean Rooms, Loveshaw/Orion Pallet Wrappers, Phoenix Compactors Waste Baler & Compactor Tampo Print/Madag Pressor/Morlock Pad Printers, Screen Printers, Warehouse Racking, Trucks, Trolleys, Digital Scales, Stock and Much More
- Exceptional Quality and Late Model Plastic Injection Moulding and Support Equipment from 2022
Subject to availability
Removal
Removal Deadline: Friday 30 August 2024, 4:00pm BST
Removal Dates: Monday 19 – Friday 30 August 2024, 9:00am – 4:00pm BST. Strictly by Appointment Only (Excluding Weekends & Monday 26 August which is a Bank Holiday)
Collection is only permitted once a paid in full invoice has been received
The Buyer and or their removal contractor must supply their own lifting equipment Method statements and risk assessments, copies of all relevant insurances documents and operator licenses must be supplied and approved ahead of any item being dismantled or moved in accordance with Health & Safety policies. Site attendance for the duration of the removal process to be confirmed and agreed in advance.
Anyone attending site will be required to wear the relevant PPE workwear including Hi-Viz Vest/Jacket and Safety Footwear.
Terms & Conditions
Buyer`s Premium of 18% will be applicable to this sale
VAT at 20% will be added to the total price and Buyer’s Premium. Purchasers from overseas should note that the VAT on the Buyer’s Premium is not recoverable.
All payments must be cleared in our account by Tuesday 20 August 2024 at 2:00pm BST
All Lots must be collected by Friday 30 August 2024, 4:00pm BST, strictly by prior appointment
All persons arriving on site must report to the entrance and complete the signing in procedure book
This site is a full PPE area and everyone must comply whilst the site is designated as such. PPE worn must comply with all relevant Method Statements. Anyone not found wearing his/her PPE will be required to leave the site, if in doubt assistance must be sought from the site Supervisor
View Standard Terms & Conditions.
London
EC2V 8EY
UK