Auction description

On Behalf of the Administrators of Henry Construction Projects Limited

Featuring;

  • 20x GASS Aluminium Shoring Systems each Comprising:- (50) 2.4m Extending Legs, (50) 1.4m Extending Legs, (2) 3.6m Extending Legs, (100) 2.4m x 1.2m Ledger Frames and (50) 1.2m x 1.1m Ledger Frames
  • 10x (200) 3.9m Scaffold Boards (4 x 50 boards)
  • 5x Approx (200) Combisafe 2.6m x 1.1m Steel Mesh Safety Barriers (4 x 50 barriers) and (50) Mixed Combi Feet
  • 3x Packages of Galvanised Steel Scaffold Poles each Comprising:- (100) 13ft Poles, (50) 11ft Poles, (50) 10ft Poles, (150) 8ft Poles, (50) 7ft Poles, (170) 6ft Poles, (500) 5ft Poles, (50) 4ft Poles and (100) 3ft Extendable Poles (Stillages Not Included)
  • 3x Packages of Scaffold Fittings each Comprising:- (600) Double Couplers, (1,200) Sleeve Couplers, (900) Single Couplers, (300) Swivel Double Couplers, (100) Hook Couplers and (100) Feet (Stillages Not Included)
  • Package of DOKA 1,350mm Aluminium Shuttering Formwork each Comprising:- (8) 1,350mm, (20) 900mm, (14) 600mm, (14) 450mm, (21) 300mm, (5) Adjustable Corners, (260) Quick Acting Clamps, (20) Multi Function Clamps, (60) Stop End Ties and (30) Wedge Clamps
  • 2x Packages of DOKA 2,700mm Aluminium Shuttering Framework each Comprising:- (70) 900mm, (30) 600mm, (30) 450mm and (14) 300mm, (260) Quick Acting Clamps, (20) Multi Function Clamps, (60) Stop End Ties and (30) Wedge Clamps
  • 3x Packages of DOKA 3,300mm Aluminium Shuttering Framework each Comprising:- (40) 1,350mm, (20) 900mm, (20) 600mm, (10) 450mm, (9) 300mm, (6) Adjustable Corners, (7) Fixed Corners, (260) Quick Acting Clamps, (25) Multi Function Clamps, (60) Stop End Ties and (30) Wedge Clamps
  • Package of HAKI Staircase Components each Comprising:- (60) Stair Flights with Landings, Handrails and Guardrails
  • 4x Packages of GASS Compatible S150 and T225 Aluminium Beams, ranging from 7.2m to 1.8m in Various Quantities as Lotted
  • (5) Alsina Single Person Fall Arrest Systems
  • Cantideck Crane Loading Platform with 2,700 Kg SWL (excludes contents)
  • Five and Six Section Welded Steel Shuttering Panel and Lifting and Storage Frames
  • Steel Fuel Tank with Hand Lever Pump Dispenser and Forklift Lifting Points
  • Trailer Engineering Single Axle Towable 2,000 Ltr Steel Fuel Tank (2015) with Hand Pump Dispenser
  • 4x Eichinger Concreting Skips
  • 1,000 Ltr Self Discharge Boat Skip
  • Atlas Copco XAS 87Kd /67Kd /130Kd7 / 175Kd7 Single Axle Towable Compressor with 1912 Hours
  • And More…

Subject to availability

Additional information

Lots 1 – 11, closing from 11:00am GMT with 1 minute intervals

Lots 12 – finish, closing from 11:20am GMT with 5 minute intervals

Removal

Successful bidders will be contacted to arrange collection. The Buyer and or their removal contractor shall provide their own transport and on-site loading assistance will be available however we do not accept any liability for any damage to lots and/or transport.

Collection times and dates will be provided by online auction staff and must be adhered to in order to facilitate orderly removal of lots by buyers. Please Note – Stillages are not available.

Removal Deadline: Wednesday 27 March 2024, 4:00pm GMT

Removal Hours: Thursday 21 – Wednesday 27 March 2024, 9:00am – 4:00pm GMT. Strictly by prior appointment, excluding weekend

Collection is only permitted once a paid in full invoice has been received

The Buyer and or their removal contractor shall provide their own transport and on-site loading assistance will be available however we do not accept any liability for any damage to lots and/or transport. Buyers’ transport agents will be responsible for securing all loads in accordance with Health and Safety regulations

Anyone attending site will be required to wear the relevant PPE workwear including Hi-Viz Vest/Jacket and Safety Footwear

Auctioneer details
Company address
11 Ironmonger Lane
London
EC2V 8EY
UK