Maynards Europe is offering an online auction on behalf of a large international manufacturer in Romania, presenting industrial machinery and production equipment suited to precision engineering and metalworking applications.
The auction features a strong line-up of CNC machining centres, CNC lathes, milling machines, presses, furnaces, cranes, welding equipment and tool setting systems.
Notable and higher-value entries include
- HEDELIUS Tiltenta 7 Magnum 1R 40/530/3200/12 - CNC Center + Swivelling Main Spindle | 2016
- HAAS ST-20 – CNC Lathe + Bar Feeder | 2014•HAAS SL-40 - CNC Lathe | 2008
- HAAS VF-10/50 - CNC Vertical Machining Center | 2007
- HAAS SL10-THE - CNC Lathe | 2007•HAAS SL10-HE - CNC Lathe | 2006
- HAAS SL-30 TBHE - CNC Lathe | 2003•HAAS SL 30 THE - CNC lathe + Bar Feeder | 2008
- MIKRON HPM 1150U iTNC530 - 5-Axis Machining Center | 2007
- DIXI MACHINES DPC 200 FANUC 15MB CHO 2X30 CHP2 - CNC Horizontal Machining Center | 2001
- DURMAZLAR HRB-4 3010 - Roll Bending Machine | 2013
- Lots of High-Quality Industrial Welding Equipment from Miller, Lincoln, Merkle...
Currency
EUR
Buyers Premium
18% or as specified on individual items
Tax Rate on Hammer Price
19% or as specified on individual items
Tax Rate on Buyers Premium
19% or as specified on individual items
Tax Rate on Charges
19% or as specified on individual items
General Payment Information
- Per bidder, there will only one invoice be issued for all lots won in one auction/sale.
- The invoice will be in PDF format and will be emailed to successful bidders within 24 hours after the last lot in the auction has closed. Alternatively, a link will be emailed from where the invoice can be downloaded.
- Payment is due immediately on receipt of invoice unless stated differently on the invoice.
- All payments must be made in the currency stated on the issued invoice.
- The only accepted form of payment is bank transfer.
- We DO NOT accept payment by cheque, debit or credit card.
- Please reference the invoice number on the bank transfer.
- For all bidders with residence outside of the country from where the assets are being sold, Maynards Europe will collect 19% of the Asset Net total as a deposit. This deposit will be refunded in full after Maynards Europe have received proof of export.
- It happens frequently that Maynards Europe at first only issue a so-called “proforma invoice”. After receipt of full payment, collection of the items and receipt of export documentation (if applicable), the final invoice will be issued.
General Collection Information
- Buyers are fully responsible for the removal of the items purchased including all transport and rigging charges.
- Items only become available for collection after Maynards Europe have received payment in full, and a collection appointment has been booked with the project manager / on-site contact.
- Buyers or third-party movers must present the ‘Paid Invoice’ confirmation to the on-site personnel when collecting and removing their items. The ‘Paid Invoice’ confirmation will be issued by Maynards Europe after receipt of the full payment and will be emailed in PDF format to the buyer.
- Buyers must complete the removal of items within the clearance deadline (individually stated for each auction / sale). Removal is by appointment only.
- Removal and on-site contact information will be emailed to buyers at the same time invoices are issued.
- Entrance to the site is subject to the Conditions of Admission for customers, agents and contractors. For your protection you will be required to wear safety equipment including high visibility jackets and safety footwear as a minimum. Everybody entering the site has to undergo a short security briefing.
- Conditions of Site Admission: All Customers, agents & contractors must report to the site manager / foreman on arrival and must not proceed on to site without permission. No persons under 16 years of age will be allowed on site.
- Buyers / Transport Companies must bring their ‘Collection Note’ document to site. If you have any questions on this, please do not hesitate to contact us on +49 8151 1878 400.
- There is NEITHER lifting equipment NOR tools for dismantling available on site. Please make your own arrangements.
- Removal of items is solely the responsibility of the purchaser and/or those collecting on their behalf. This may require you to remove other items to gain access although efforts will be made to keep this to a minimum. Dismantling of machinery may be required.
- The buyer and their removal company are responsible for the condition of the site after removal of their goods. Electrical connections must be left in a safe condition and protrusions (grouting, hold down bolts / studs) must be removed and left flush to ground level. The site must be cleaned after removal and all waste must be disposed of.
- The buyer and their removal company are responsible for conducting the removal and transportation of their goods according to the standard environmental regulations.
- Removal must be carried out without damage to the site itself or any property/ items on or near the site. Liability for any such damage lies with the buyer.
- If items have not been removed by the clearance deadline, our standard Terms & Conditions apply.
- Our staff are on site to supervise and control removals only, they are not permitted to move equipment or assist with the removal in any way. We thank you for your cooperation in helping to keep yourself and others safe while on site and for aiding us in the timely removal of goods from site.
82319 Starnberg
Germany